This is Eskom's V47 turbine. It has a 47 m rotor diameter and a 660 kW rating. This was the only turbine rotating at the time of our visit. Maintenance issues have plagued the site since its opening. It takes up to 6 months for needed spare parts to arrive from Europe. And, Eskom doesn't want to keep spares on hand, due to the cost. So, the machines often sit idle.